References
ACCOLADE
New Buildings
OSTROV U STŘÍBRA, CZE
Warehouse
Industrial lighting
Annual energy savings 103,260 kWh
65 %

Original installation

Original installation ARGIA lighting solution
Type of luminary ZUMTOBEL and THORN luminaries
Number of luminaires 0 pcs 650 pcs
Total Input 0.00 kW 39.40 kW
Consumption kWh/year 0 kWh 158,861 kWh
Project resultCustomer´s total operation costs have been reduced by 65% together with significant improvement of the illumination level.
Warranty 5 years

ARGIA lighting solution

Type of luminary

ZUMTOBEL and THORN luminaries

Number of luminaires 650 ks
Total Input39.4 kW
Consumption kWh/year 158861 kWh
Project resultCustomer´s total operation costs have been reduced by 65% together with significant improvement of the illumination level.
Warranty 5 years

Installation parameters:

For the major investor Accolade, we have just delivered complete indoor artificial lighting including installation. This new construction project of 10,000m2 was realized by General Developer Kajima in Ostrov u Stribra. The hall was prepared for new tenant Raben. The building was specially designed for warehousing and logistics. All artificial and emergency lighting  is based on the high quality ZUMTOBEL and THORN system.