References
DICKA LOGISTICS

DICKA LOGISTICS

Download
Renovation
MEXICO CITY, MEX
Logistics warehouse
Industrial lighting
Annual energy savings 224,104 kWh
79 %

Original installation

Original installation ARGIA lighting solution
Type of luminary Fluorescent luminaires T5 6x54W GE ABV3 dimmable with combined senso
Number of luminaires 206 pcs 193 pcs
Total Input 71.48 kW 21.34 kW
Consumption kWh/year 284,013 kWh 59,909 kWh
Project resultCustomer’s total operating costs reduced by 79% while significant improvement of the illumination level and adding illumination of another areas.
Warranty 10 years

ARGIA lighting solution

Type of luminary

GE ABV3 dimmable with combined senso

Number of luminaires 193 ks
Total Input21.34 kW
Consumption kWh/year 59909 kWh
Project resultCustomer’s total operating costs reduced by 79% while significant improvement of the illumination level and adding illumination of another areas.
Warranty 10 years

Installation parameters:

  • Dimmable luminaires with combined daylight and presence sensor
  • Installation without limitation of operation
  • Operating costs reduced by 79%
  • 10-year warranty

For DICKA LOGISTICS we have replaced the already unsuitable lighting of the logistic and warehouse hall with a total area of 12,211 m2 in the industrial park Prologis Park Agave 3. The installation was carried out without limitation of operation and outdated fluorescent luminaries were replaced by modern dimmable LED luminaries individually controlled with integrated combined daylight and presence sensor. Thanks to ARGIA solution, the customer has achieved an operating cost savings of 79% with a significant increase 50% in the lighting and new lighting in other areas. Everything was delivered on time and in perfect quality.

"First successful implementation of Prologis LightSmart project. Great lighting improvement, with quick and professional installation." Vit Kovarik CEO

8 / 94
94
Country
Services
Industry
References filter