References

    News

      PIRELLI NEUMÁTICOS

      PIRELLI NEUMÁTICOS
      Renovation
      GUANAJUATO, MEX
      Production hall
      Industrial and outdoor lighting
      Annual energy savings 3,232,470 kWh
      66 %

      Original installation

      Original installation ARGIA lighting solution
      Type of luminary Fluorescent luminaires T5 GE ABV3 series, OFFICE ELP series, OFFICE RD-OUT series
      Number of luminaires 2,884 pcs 3,332 pcs
      Total Input 702.36 kW 299.77 kW
      Consumption kWh/year 4,897,682 kWh 1,665,212 kWh
      Project result In the largest PIRELLI production hall in Mexico, with a total area of more than 100,000 m2, the customer achieved a 66% savings on the total operating costs of lighting.
      Warranty On-Site 6-year

      ARGIA lighting solution

      Type of luminary

      GE ABV3 series, OFFICE ELP series, OFFICE RD-OUT series

      Number of luminaires 3332 ks
      Total Input299.77 kW
      Consumption kWh/year 1665212 kWh
      Project result In the largest PIRELLI production hall in Mexico, with a total area of more than 100,000 m2, the customer achieved a 66% savings on the total operating costs of lighting.
      Warranty On-Site 6-year
      Reference sheet

      Installation parameters:

      • Lighting design according to interior and exterior layout
      • Production hall with an area of more than 100,000 m2
      • Project "Light as a Service"
      • Full On-Site 6-year warranty

      For the Italian multinational company PIRELLI, the world leader in the tire market, we have supplied new modern and energy-saving LED luminaires for production, office and outdoor areas. The project included the dismantling of inconvenient fluorescent luminaires and the installation of over 3,300 new LED luminaires without interrupting continuous operation. Lighting was delivered within the project "Light as a Service". It is a lease of a lighting system for 6 years, where we guarantee a minimum level of lighting, guarantee of electricity consumption and On-Site 24/7 service and maintenance. Thanks to GE CURRENT ABV3 luminaires connected to the existing GREENGATE CONTROL system and Daylight sensors, customer saves up to 66% on operating costs.

      6 / 134
      134
      Services
      Industry
      References filter