      Logistics, Logistics warehouse
      Industrial lighting
      Annual energy savings 532,355 kWh
      76 %

      Original installation

      Original installation ARGIA lighting solution
      Type of luminary Fluorescent T5 & T8 luminaires Eaton
      Number of luminaires 436 pcs 436 pcs
      Total Input 166.50 kW 38.50 kW
      Consumption kWh/year 692,515 kWh 160,160 kWh
      Project resultThe customer‘s total operating costs were reduced by 76% with a significant increase in lighting levels.
      Warranty 5 years

      ARGIA lighting solution

      Type of luminary

      Eaton

      Number of luminaires 436 ks
      Total Input38.5 kW
      Consumption kWh/year 160160 kWh
      Project resultThe customer‘s total operating costs were reduced by 76% with a significant increase in lighting levels.
      Warranty 5 years
      Reference sheet

      Installation parameters:

      For ASAINT company we have replaced the already unsuitable lighting of the logistic and warehouse hall with a total area of 24,715 m2 in the Prologis Los Altos Industrial Parks. The installation was carried out without limitation of operation and outdated fluorescent luminaries were replaced by modern dimmable LED luminaries individually controlled with integrated combined daylight and presence sensor. Thanks to ARGIA solution, the customer has achieved an operating cost savings of 76% with a significant increase 50% in the lighting and new lighting in other areas. Everything was delivered on time and in perfect quality.