References
PROLOGIS
Renovation
Prologis Mexico, MEX
Warehouse
Industrial and office lighting
Annual energy savings 20,285,081 kWh
70 %

Original installation

Original installation ARGIA lighting solution
Type of luminary Fluorescent luminaires T5 Acuity Brands, GE lighting, Eaton
Number of luminaires 21,996 pcs 21,996 pcs
Total Input 6,957.70 kW 2,081.50 kW
Consumption kWh/year 28,943,955 kWh 8,658,874 kWh
Project resultThe customer's total operating costs were reduced by up to 70%.
Warranty 10 years

ARGIA lighting solution

Type of luminary
Acuity Brands, GE lighting, Eaton
Number of luminaires 21996 ks
Total Input2081.5 kW
Consumption kWh/year 8658874 kWh
Project resultThe customer's total operating costs were reduced by up to 70%.
Warranty 10 years

Installation parameters:

  • 82 projects with a total area of more than 851,000 m2
  • 36 logistic centers
  • 7 different cities
  • 10 year warranty

For the leading global developer PROLOGIS MEXICO, from 2019 to 2021, we realized the replacement of obsolete industrial and office lighting in industrial and logistic centers in Guadalajara, Monterrey and Mexico City. There were 82 halls with a total area of over 851,000 m2, for example for DHL, KUEHNE NAGEL, AVIOR and DICKA. The new modern LED luminaires are equipped with combined motion and luminance sensors that control each luminaire separately. By installing new modern LED luminaires with combined motion and brightness sensors, the customer saves more than 70% of electricity.

1 / 7
104
Country
Services
Industry
References filter